top of page
House Construction Site

New Construction/Remodels

Professional electrical services for new construction projects and home remodels of all sizes. We can handle electrical installation from the initial rough-in through final trim, including wiring for lighting, outlets, switches, appliances, dedicated circuits, and other electrical systems.

Whether you’re building a new home, adding a room, finishing a basement, or updating an existing space, we’ll work with you and your project requirements to provide a safe, reliable, and code-compliant electrical installation. Project pricing is based on the scope of work and will be provided upfront before work begins.

What Does a New Construction Electrical Installation Include?

A new construction electrical installation typically includes everything from installing the wiring and electrical boxes during the rough-in stage to installing outlets, switches, light fixtures, and other devices during the final trim stage.

​

Depending on the project, electrical work can include lighting, receptacles, dedicated circuits for appliances, smoke and carbon monoxide detectors, bathroom GFCI protection, exterior lighting, ceiling fans, and other electrical equipment.

​

The exact scope depends on the plans and the homeowner's selections. We’ll review the project requirements and provide a clear scope of work and upfront pricing before the work begins.

What Should I Plan for Before Electrical Work Begins?

Planning electrical locations before construction begins can help prevent costly changes later. Homeowners should consider where they want outlets, switches, lighting fixtures, ceiling fans, televisions, appliances, and other electrical equipment located.

​

It's also a good time to think about future needs such as an EV charger, hot tub, standby generator, home office, workshop, or additional lighting.

 

The earlier these decisions are made, the easier it is to install the electrical system exactly where you need it and allow for future upgrades.

How Long Does Residential Electrical Work Take?

The timeline depends on the size and complexity of the project. A smaller remodel may take only a few days, while a complete new construction project can require several weeks of electrical work spread across different stages of construction.

​

The schedule can also be affected by inspections, material availability, changes to the project, and coordination with other trades such as framing, plumbing, HVAC, and drywall.

​

We’ll discuss the expected electrical schedule during the estimating and planning process so you know what to expect.

How Much Does Electrical Work Cost for a New Home or Remodel?

The cost of residential electrical work varies significantly depending on the size and complexity of the project. Factors that can affect the price include the size of the home, number of outlets and lighting fixtures, electrical panel capacity, dedicated circuits, specialty equipment, and the amount of wiring required.

​

For remodels, the condition of the existing electrical system and how accessible the walls and ceilings are can also have a major impact on cost. Rather than relying on a generic price per square foot, we evaluate the actual scope of work and provide an estimate based on the specific project.

What Is the Electrical Rough-In and Trim Process?

Rough-in is the first major stage of electrical installation. During this stage, wiring is installed throughout the home and electrical boxes are installed for outlets, switches, lights, and other devices. The electrical system is then prepared for the required inspection before the walls are closed.

​

Trim, sometimes called finish work, takes place after drywall and other finishes are completed. This is when outlets, switches, light fixtures, ceiling fans, breakers, and other devices are installed and connected.

​

Once the installation is complete, the electrical system is tested to make sure everything is operating properly.

How Can I Future-Proof My Home’s Electrical System?

Building or remodeling a home is a great opportunity to plan for electrical needs you may have in the future. Installing additional capacity or wiring during construction is often easier and less expensive than modifying the system later.

​

Consider planning ahead for things such as EV chargers, hot tubs, standby generators, larger appliances, home offices, workshops, exterior lighting, and additional HVAC equipment.

​

Even if you don't need these features today, discussing them with your electrician during the planning stage can help ensure your electrical system has the capacity and infrastructure to accommodate them in the future.

bottom of page